Alara Dispatches 1,305 WMT Copper Shipment From Oman

By Mining Hub News Desk
16 September 2026, 7:11 p.m. EDT 1 min read
Investor Presentation – image 31
Al Wash-hi Majara copper mine. Source: Alara Resources Limited

Alara Resources Limited has dispatched its 64th copper concentrate shipment from Sohar Port in Oman, carrying 1,305 wet metric tonnes of concentrate containing approximately 243 metric tonnes of copper.

The shipment departed on 16 September 2026 from the Al Wash-hi Majaza copper mine, which is operated through Alara's 51%-owned joint venture company, Al Hadeetha Resources LLC.

The latest parcel marks an increase from the previous shipping cycle on 10 September 2026, when the 63rd shipment totaled 1,059 wet metric tonnes of copper concentrate containing approximately 202 metric tonnes of copper.

Read the full announcement: 64th Copper Concentrate Shipment Dispatched from Sohar Port