Arizona Gold & Silver Intersects 90.71 Metres at 1.45 g/t Gold at Philadelphia Project

By Mining Hub News Desk
8 September 2026, 9:24 a.m. EDT 2 min read
Philadelphia Property – Arizona Gold & Silver
Excavator at the Philadelphia Property. Source: Arizona Gold & Silver Inc.

Arizona Gold & Silver Inc. has reported assay results from three infill drill holes completed at the Philadelphia Gold-Silver Project in Mohave County, Arizona, highlighted by hole PC26-171B intersecting 90.71 metres at 1.45 g/t gold.

The company focuses exploration on evaluating the low-sulfidation epithermal gold-silver system along the Arabian Fault corridor at the Philadelphia Project. Infill holes PC26-171B, PC26-168 and PC26-170 all intersected broad mineralized intervals ranging from 59.19 to 90.71 metres containing higher-grade internal zones. Hole PC26-171B returned a total interval of 90.71 metres at 1.45 g/t gold and 3.9 g/t silver from 197.21 metres, including a 33.28-metre section at 3.02 g/t gold from 253.44 metres, and a higher-grade core of 9.94 metres at 5.58 g/t gold from 267.16 metres.

Hole PC26-168 intersected 30.91 metres at 1.99 g/t gold from 235.15 metres, including 9.02 metres at 3.79 g/t gold. Hole PC26-170 returned 59.19 metres at 1.02 g/t gold from 211.23 metres, including 21.48 metres at 2.14 g/t gold. True thickness for the reported intercepts is estimated at approximately 60% of drilled thickness.

“These results provide further evidence of the scale and continuity of mineralization at Philadelphia. Evolution Mining’s strategic investment has enabled us to expand drilling to 24-hour operations. We are now sourcing a second drill. Combined with our expanded permit covering 16 additional drill pads, this positions us to accelerate testing of the Perry Zone at depth and advance multiple high-priority targets across the broader project.”

“These are the final infill holes in the current phase of the program. The results continue to demonstrate broad, continuous gold mineralization in the Perry Zone, with higher-grade intervals occurring within wider mineralized envelopes. This repeated pattern increases our confidence that we are defining a coherent mineralized system rather than isolated intersections.”

“The results are helping us refine the system’s geometry and guide deeper drilling, which is now testing the projected down-dip continuation of the high-grade Perry Zone and the broader potential beneath Red Hills.”

— Mike Stark, President and CEO, and Dr. Lex Lambeck, Senior Vice President Exploration

Deeper drilling has advanced beneath the Red Hills target to test the down-dip continuation of the Perry Zone. Assay results are currently pending for completed drill holes PC26-172 and PC26-173, while drill hole PC26-174 is underway.

Screenshot 2026-09-08 091832.png
Source: Arizona Gold & Silver

For more details on the Philadelphia Project, watch this video overview: https://www.youtube.com/watch?v=WpIgP6WEbH8&t=9s

Read the full announcement: Arizona Gold & Silver Infill Drilling Intersects 90.71 Metres at 1.45 g/t Gold, Including 9.94 Metres at 5.58 g/t Gold, at the Philadelphia Project, Arizona