Avira Hits 7 Metres At 6.11 g/t Gold In Maori Queen Drilling At Mt Cattlin

By Mining Hub News Desk
12 August 2026, 8:30 p.m. EDT 2 min read

Avira Resources has received assay results for all 18 holes completed in its maiden reverse circulation drilling program at the Mt Cattlin Gold Project in Western Australia, highlighted by a standout intercept of 7 metres at 6.11 g/t gold from 105 metres at the Maori Queen prospect.

The latest batch of results confirms that high-grade gold mineralization continues at depth within the system. The 7-metre intercept in drill hole RAGC116 includes a higher-grade core of 2 metres at 15.1 g/t gold from 107 metres, intersected 25 metres down-plunge of a previous historical intercept.

Additional results from the final five holes of the program include hole RAGC117, which returned 5 metres at 1.85 g/t gold from 106 metres, including 1 metre at 7.47 g/t gold. Hole RAGC113 intersected 8 metres at 1.4 g/t gold from 37 metres, alongside a 1-metre interval at 3.06 g/t gold from 26 metres. Shallower drilling in hole RAGC116 also returned two separate upper mineralized zones, cutting 2 metres at 1.63 g/t gold from 61 metres and 2 metres at 1.31 g/t gold from 101 metres.

The mineralization at Maori Queen is interpreted as a stacked, shear-hosted architecture featuring a steeply north-west-dipping quartz-sulphide Main Lode flanked by parallel footwall and hanging-wall lodes within sheared basalt and dolerite. Broader lower-grade envelopes also accompany the higher-grade shoots, including a 27-metre intersection at 0.37 g/t gold from 68 metres in hole RAGC118, pointing to potential disseminated tonnage surrounding the main structures.

“These latest results from our maiden RC program at Maori Queen confirm that high-grade gold continues at depth. Our focus now turns to completing Phase 1 - testing further down-dip extensions at Maori Queen, while putting rigs onto the high-grade Sirdar prospect and Ellendale for the first time. We look forward to updating the market as this exciting project continues to grow.”

— Andrew van Bentum, Chief Executive Officer

Fieldwork is scheduled to resume in September 2026, when Avira plans to resume Phase 1 RC drilling at the project, focusing on testing down-dip extensions at Maori Queen and commencing first-pass drilling at the high-grade Sirdar and Ellendale prospects.

Read the full announcement: Outstanding High-Grade Gold Confirmed at Mt Cattlin