Cabral Gold Hits 8.9m at 5.8 g/t Gold at Jerimum Cima
Cabral Gold Inc. reported assay results from ten diamond drill holes at the Jerimum Cima target within the Cuiú Cuiú gold district in Brazil, highlighted by hole DDH411 intersecting 8.9 metres at 5.8 g/t gold from 208.1 metres, including 1.8 metres at 28.4 g/t gold from 212.2 metres.

The intercept in hole DDH411 defines a previously unrecognized mineralized structure located approximately 200 metres south of the main zone at Jerimum Cima. This new zone trends east-west, runs parallel to the central high-grade system, and remains open to the east, west and at depth.
Additional drilling tested down-dip extensions of parallel mineralized trends. Hole DDH393 returned 9.3 metres at 2.78 g/t gold from 207.1 metres, including 1.7 metres at 7.2 g/t gold, alongside 10.2 metres at 1.00 g/t gold from 225.0 metres. Hole DDH396 intersected 8.9 metres at 0.50 g/t gold from 195.6 metres and 11.1 metres at 0.58 g/t gold from 241.3 metres, including 0.7 metres at 7.82 g/t gold.
Several holes testing areas outside the primary trend also intersected shallow, low-grade gold values within surface blanket sediments and saprolite, including 26.0 metres at 0.28 g/t gold from surface in DDH388, 34.9 metres at 0.24 g/t gold from 1.0 metre in DDH392, and 36.7 metres at 0.18 g/t gold from surface in DDH390.
“The identification of a new mineralized zone at Jerimum Cima, located approximately 200m south of and running parallel to the main centrally located high-grade zone, is highly encouraging. Further drilling will be required to determine the extent and along strike continuity of this new mineralized zone which remains open to the east, west and at depth.”
— Alan Carter, President and CEO
The primary objective of the ongoing drilling program at Jerimum Cima is to generate maiden resources for both the gold-in-oxide blanket and underlying primary structures. Diamond drilling continues to test eastern strike extensions, while drilling is also underway at the Machichie Main deposit and Machichie West target to support an updated global resource base later this year. Cabral is constructing a Phase 1 gold-in-oxide heap leach operation at Cuiú Cuiú, with commercial production anticipated in the fourth quarter of 2026.
Read the full announcement: Cabral Gold Drills 8.9m @ 5.8 g/t gold and Intersects New Mineralized Zone at Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil