Denarius Metals Hits 33 Metres Grading 5.68 g/t Gold at Zancudo

Denarius Metals Corp. has intersected a continuous interval of 5.68 g/t gold over 32.95 metres from drill hole ZM-210 at the Las Brisas target within the Zancudo Project in Colombia.
The assay results released from eight recent drill holes totaling approximately 1,610 metres bring total drilling at Zancudo to 2,270 metres across 12 holes. The ongoing surface in-fill program aims to tighten drill spacing to 50 metres to support potential resource reclassification in an upcoming mineral resource update.
Hole ZM-210 encountered mineralization from 203.0 metres to 235.95 metres, including 20.18 g/t gold over 3.10 metres at the Santa Catalina splay and 26.35 g/t gold over 2.50 metres on the Santa Catalina structure. Silver results for drill hole ZM-210 remain pending.
Other key intersections from the latest batch include hole ZM-205, which returned 41.82 g/t gold and 36.1 g/t silver over 1.00 metre from an unnamed structure, and hole ZM-206, which intercepted 15.23 g/t gold and 38.4 g/t silver over 1.35 metres on the Manto Antiguo splay.
Drilling from platform IF-12 also identified a local dextral reverse fault that offsets the Santa Catalina, Manto Antiguo, and Manto Antiguo Lower structures by approximately 40 metres. Alteration assemblages and sulphide mineralogy are preserved on both sides of the fault zone.
“The thick, high-grade interval in ZM-210, the hanging-wall mineralization and the emerging Manto Antiguo Lower structure, all identified in the latest round of drilling, continue to demonstrate the high-grade continuity and upside of the Santa Catalina and Manto Antiguo systems and the potential for resource growth at our Zancudo Project”
— Serafino Iacono, Executive Chairman
The Zancudo Project includes the historic producing Independencia mine and sits in the Cauca Belt approximately 30 kilometres southwest of Medellin. Denarius Metals is constructing a 1,000 tonnes per day processing plant at the site, scheduled to begin operations in the fourth quarter of 2026. The company is also developing a new portal and 600-metre ramp to access new mining fronts by mid-2027.
Read the full announcement: DENARIUS METALS ANNOUNCES 33-METRE CONTINUOUS INTERVAL GRADING 5.68 G/T GOLD ON THE SANTA CATALINA STRUCTURE AT THE LAS BRISAS TARGET FROM ITS 2026 DRILLING CAMPAIGN AT ITS ZANCUDO PROJECT IN COLOMBIA