Fireweed Hits 64 m True Width at Tom South

By Mining Hub News Desk
15 September 2026, 7:45 p.m. EDT 2 min read

Fireweed Metals Corp. has intersected a true width of 64 metres grading 8.35% zinc equivalent in hole TS26-003 at the Tom South target within the Macpass Project in Yukon, Canada.

Drilled as a 180-metre down-dip and east along-strike step-out from previous hole TS25-001D1, hole TS26-003 extended the known mineralized zone outside the spatial extents of the current Macpass Mineral Resource. The 64-metre primary interval, encountered from 982.34 metres downhole, grades 5.42% zinc, 3.21% lead, and 16.77 g/t silver, and includes a 43-metre true width sub-interval grading 10.53% zinc equivalent. That narrower section encompasses a 27-metre true width grading 12.85% zinc equivalent, consisting of 7.78% zinc, 5.52% lead, and 30.27 g/t silver.

Figure 1 Cross section TK to TK
Section through Tom South showing drillhole TS26-003 and intersected mineralization. Source: Fireweed Metals Corp.

The intersection represents the thickest drilled to date at Tom South, demonstrating that the zone is thickening toward the east, where it remains open. The interval also contains elevated levels of the critical minerals germanium and gallium.

“Drilling at Tom South continues to deliver with another successful high-grade and very wide intersection in our farthest eastern step-out to date from known mineralization. Guided by the early season's results, we have targeted our exploration strategy to better follow emerging grade trends at depth and are meeting with success based on this vectoring. Drilling in this zone continues to delineate the most important discovery of zinc, lead, and silver mineralization at the Macpass district since the discovery of Boundary West.”

— Ian Gibbs, President and CEO

Fireweed Metals currently maintains three active drill rigs on site for the 2026 Macpass exploration program, having completed 6,505 metres to date, including 4,710 metres at Tom South and 1,795 metres at Tom East targeting high-grade massive and laminated sulphides alongside a muon tomography survey.

Separately, the company finished a 2,099-metre drilling program supporting an updated feasibility study for the Mactung project that is scheduled for completion in early 2027. Fireweed Metals will continue to release additional assay results from Tom South, Tom East, and Mactung as analyses are received and interpreted.

Read the full announcement: Fireweed Intersects 43 m True Width Sub-Interval of 10.53% ZnEq in Tom South Step Out