Green Bridge Metals Hits 195 Metres at 10.18% TiO2 in Final Titac South Assays
Green Bridge Metals Corporation has intersected 195.0 metres grading 0.25% copper and 10.18% titanium dioxide, including a 62.0-metre higher-grade section running 0.29% copper and 10.54% titanium dioxide, in final assay results from its Phase 1 diamond drilling program at the Titac Project in northeastern Minnesota.
The results, generated from drill hole TS26-004a at the Titac South prospect, confirm existing mineralization within the southwest portion of the zone. The Titac Project forms part of the company's South Contact Zone Project in northeastern Minnesota, which hosts titanium-copper-vanadium mineralization within the Duluth Complex.
The company also reported results from exploratory step-out hole TS26-007, which targeted a previously untested geophysical anomaly identified through 3D VTEM inversion modelling. That hole returned 12.0 metres at 0.20% copper, 8.33% titanium dioxide, and 0.15% vanadium pentoxide. All six holes in the Phase 1 program intersected sulphide mineralization.

The data support the targeting approach used on the property, where 3 of 8 identified geophysical targets have now been drill-tested, leaving 5 targets untested for future exploration.
“The final assay results from our six-hole Phase 1 program at Titac South provide further confidence in our geological interpretation of the system, and show copper consistently occurring alongside titanium in the mineralization. Equally significant is our step-out hole, which successfully intersected copper and titanium mineralization at a previously untested geophysical target, validating our 3D VTEM inversion model as an effective tool for identifying new mineralized zones, with five additional targets across the property now available for follow-up drilling. Given Phase 1 results, we are accelerating Phase 2 well ahead of the previously planned 2027 program. Our Phase 2 goal is to bring copper into our existing titanium resource and expand it through additional drilling at Titac North. Details of the Phase 2 program will be announced shortly.” — David Suda, President and Chief Executive Officer
Green Bridge Metals plans to release details of its Phase 2 drilling program shortly, with an overarching target to complete a scoping-level study for the Titac Project by the end of 2027.
Read the full announcement: Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target