Tiger Gold Intersects 79 m at 0.8 g/t Au in Ceibal Step-Out Drilling at Quinchía

Tiger Gold Corp. has intersected 78.63 metres grading 0.8 g/t gold from 204 metres downhole, including a higher-grade interval of 25.56 metres grading 1.4 g/t gold, in a 192-metre northwest step-out hole at the Ceibal target within its Quinchía Gold Project in Colombia.
Drillhole CEDDH-014 also encountered a second deeper interval of 86 metres grading 0.5 g/t gold from 296 metres downhole, including 10 metres grading 1.5 g/t gold and 9.55 metres grading 1.3 g/t gold. A second step-out hole, CEDDH-016, tested the northwestern margin 235 metres northwest of CEDDH-013, returning 34 metres grading 0.5 g/t gold from 10 metres downhole, including 6 metres grading 2.1 g/t gold. Step-out hole CEDDH-015, drilled 210 metres southeast of CEDDH-003, intersected 14 metres grading 0.2 g/t gold from 74 metres downhole but did not extend the mineralized corridor in that direction. All reported intervals represent downhole core lengths, with true widths remaining unknown at this early stage.
Tiger Gold holds a 100% interest in the Quinchía Gold Project following its acquisition from LCL Resources Limited in July 2026. The company closed an oversubscribed $21 million financing of special warrants in June 2026 to fund accelerated drilling at Ceibal and advance resource definition goals, targeting a maiden Mineral Resource estimate for Ceibal in the first quarter of 2027.
One drill rig is currently active at Ceibal, while two rigs are completing infill, extension, and gap drilling at the Tesorito deposit. Assays are pending from both targets, including offset scissor holes CEDDH-020 and CEDDH-021 designed to help resolve the orientation and dip of the mineralized corridor. A fourth drill rig is also on order.
“I am excited about what CEDDH-014 has shown us at Ceibal. It extended gold mineralization further to the northwest, and these holes are doing exactly what large step-out drilling should be doing at this stage - showing us where the higher-grade portions of the system sit, where its margins might be, and where it remains open,” commented Robert Vallis, President and CEO. “That is the information we need to focus the drilling that will support a maiden Mineral Resource estimate for Ceibal that we are targeting for the first quarter of 2027.”
— Robert Vallis, President and CEO
Read the full announcement: Tiger Gold Drills 79 m @ 0.8 g/t Au, Including 26 m @ 1.4 g/t Au, in 192- Metre Northwest Step-Out at Ceibal