Western Star Resources Starts Maiden Field Program at Eagle Point Tungsten Project

By Mining Hub News Desk
12 August 2026, 10:51 a.m. EDT 2 min read

Western Star Resources has commenced its maiden field exploration and drill-planning program at the Eagle Point tungsten project in Hidalgo County, New Mexico, engaging Dahrouge Geological Consulting Ltd. to carry out mapping, sampling, and drill-collar ground truthing.

The program is designed to validate and refine the geological model, evaluate the extent of tungsten mineralization, and ground-truth proposed drill locations ahead of future drilling. Dahrouge’s scope includes detailed structural mapping, channel and grab sampling submitted to ALS Tucson, and the evaluation of areas surrounding proposed targets to identify expansion opportunities.

Eagle Point is a past-producing skarn system comprising 24 lode claims in the Granite Pass area of the Little Hatchet mining district. Historical records show approximately 1,800 tons of scheelite-bearing material were mined and shipped during 1943–44 at a basis of 0.48% tungsten trioxide. Historical USGS estimates outlined an approximate 170,000-ton mineralized system, comprising roughly 70,000 tons grading 0.40% tungsten trioxide and 100,000 tons grading 0.25% tungsten trioxide.

Nearby explorer Spartan Metals reported historic drilling validation results including 537 feet grading 0.23% tungsten trioxide equivalent at its Victorio tungsten-molybdenum project within the surrounding district in June 2026.

“Eagle Point has a combination that is increasingly difficult to find in the United States: documented historical tungsten production, multiple mineralized skarn bodies exposed at surface, significant historical U.s. Government involvement and modern government sampling that has confirmed very high-grade tungsten mineralization at surface.”

— Blake Morgan, President and CEO

The project remains largely untested at depth and along strike by modern exploration. Historical work noted eight skarn bodies exposed across surface cuts, while drilling was restricted to a small number of shallow holes around the main open cut.

Dahrouge is scheduled to deliver a field summary and assessment report targeting completion during September 2026. The new field data will be integrated with the historical database to rank and refine targets for subsequent drill testing, subject to permitting, technical review, and financing.

Read the full announcement: Western Star Resources Commences Maiden Field Program at Eagle Point to Advance Past-Producing U.S. Tungsten Project Toward Drilling